×

TAG CLOUD

Fractal Systems Quebec

4070 Portland Blvd.
Sherbrook, QC Canada J1L 2Y4

2009-2010 - Pilot Facility

Fractal validated the bench scale studies by processing diluted heavy oil in the field at a 300 barrel per day “Pilot Facility”.  The field performance effectively demonstrated that the bench scale results could be “scaled up” (e.g. 300:1) in a field facility.

TOP